The approach.
FSG was engaged to review the foundation design, assess the causes of pile refusal and identify opportunities to improve installation efficiency. A targeted programme of pile testing and geotechnical assessment was undertaken across the site, supported by detailed analysis of installation data and ground conditions. Using the results of this investigation, FSG redesigned the foundation system and demonstrated that significantly shorter piles could achieve the required performance criteria. Areas with differing ground behaviour were identified using statistical analysis, allowing installation methodologies to be tailored to site conditions and alternative construction approaches, such as pre-boring, to be adopted where required. FSG remained closely involved throughout construction, providing ongoing technical advice, validation testing and pile verification services.