• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar

FSG Geotechnics - Foundations

Brisbane +61 7 3831 4600| Melbourne +61 3 9417 4333| Perth +61 8 6267 0308

Follow us

  • LinkedIn
Menu
  • About Us
  • Academic and Industry Activities
  • Publications
  • Contact Us
  • Careers

Warringah Freeway Upgrade

Sector: Infrastructure
Client: CPB-Downer Joint Venture, ADG

Services Provided

Geotechnical proof engineering and Independent Check Engineer (ICE) for temporary works

Project Brief

FSG provided geotechnical support to ADG in the proof engineering and independent checking of a range of temporary works associated with the Warringah Freeway Upgrade (WFU).

The Warringah Freeway, immediately north of the Sydney Harbour Bridge, is one of the busiest and most complex road corridors in Australia, and involves the upgrade of several significant interchanges, untangling of traffic merges, addition of a dedicated busway and accommodation of tunnel portals for the Beaches link tunnel at the northern end, and Western Harbour tunnel at the southern end of the alignment.

Site Challenges

FSG has been involved in review and proof engineering of more than 20 different temporary works packages, ranging from relatively simple hardstands and working platforms, through to retaining walls and cuttings and several tunnel access shafts in varying ground conditions.  Each design package required works to be completed in tight conditions with a high level of complexity associated with geometry and site constraints, such as nearby utilities, live traffic or other physical constraints.  Reviews were required with often short turn-around times and required a good understanding of construction techniques deployed to ensure that designs were not overly conservative but remain safe and fit for purpose.  At the same time, the challenging geometry and congestion at some locations meant that FSG had to carefully review loading conditions and ensure an appropriate range of conditions are accounted for in each package.

Primary Sidebar

  • Warringah Freeway Upgrade
  • Sydney Gateway
  • Numurkah Solar Farm
  • Ipswich Motorway Upgrade (Rocklea to Darra – Stage 1)
  • Cape Lambert Wharf B
  • Mt Mercer Wind Farm Feeder Line
  • FSG Logo
    • LinkedIn
    About FSG
    • About Us
    • Academic and Industry Activities
    • Publications
    • Contact Us
    • Careers
    Our Services
    • Site Investigation and Geotechnical Testing
    • Earthworks
    • Pavement Engineering Services
    • Geotechnical
    • Foundations
    • Constructability
    • Pile Testing
    Our Experience
    • Warringah Freeway Upgrade
    • Sydney Gateway
    • Numurkah Solar Farm
    • Ipswich Motorway Upgrade (Rocklea to Darra – Stage 1)
    • Cape Lambert Wharf B
    • Mt Mercer Wind Farm Feeder Line
    © 2025 FSG Geotechnics - Foundations
    Web Design by iCreate Advertising