• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar

FSG Geotechnics - Foundations

Brisbane +61 7 3831 4600| Melbourne +61 3 9417 4333| Perth +61 8 6267 0308

Follow us

  • LinkedIn
Menu
  • About Us
  • Academic and Industry Activities
  • Publications
  • Contact Us
  • Careers

Dr. Julian Seidel Presenting on The Reliability of Pile Capacity Assessment Methods

April 18, 2018

How reliable are the various methods of assessment of the pile ultimate geotechnical strength?   What is the basis of the various geotechnical reduction factors used in Australian Standards 5100 and 2159?  These were a few of the questions raised and addressed by FSG’s technical director Dr Julian Seidel at a recent presentation at Queensland Department of Transport and Main Roads.  About 2 dozen Structural, Civil and Geotechnical Engineers attended. Julian was a contributor to AS 2159 and has been involved with pile testing for over 30 years.  He shared his experiences and evidence for the basis of the reliability values at this presentation as well as discussing pile drivability issues.  FSG is committed to sharing their knowledge and experience with the engineering community with a view to improving the understanding of pile construction, testing and verification.

 

Primary Sidebar

  • Jordan Skinner from the ”Crushing it in Construction” interviews Ben Collingwood
  • Dr Ian Van Wijk joins the FSG team
  • Joel Gniel joins the FSG team
  • Jim Finlayson joins the FSG team
  • Yearly Wrap Up
  • Dr Burt Look  will be presenting at the Engineers Australia Civil Branch AGM in Brisbane on December 3, 2018.
  • FSG Logo
    • LinkedIn
    About FSG
    • About Us
    • Academic and Industry Activities
    • Publications
    • Contact Us
    • Careers
    Our Services
    • Site Investigation and Geotechnical Testing
    • Earthworks
    • Pavement Engineering Services
    • Geotechnical
    • Foundations
    • Constructability
    • Pile Testing
    Our Experience
    • Warringah Freeway Upgrade
    • Sydney Gateway
    • Numurkah Solar Farm
    • Ipswich Motorway Upgrade (Rocklea to Darra – Stage 1)
    • Cape Lambert Wharf B
    • Mt Mercer Wind Farm Feeder Line
    © 2025 FSG Geotechnics - Foundations
    Web Design by iCreate Advertising